Quick Callback

If you'd like us to call you back, please leave your
name & number - we will get back to you as soon as possible.
  • This field is for validation purposes and should be left unchanged.
A simple palate of colours is used to dramatic effect

The half day with the architect was the basis for the whole project. He was very creative and came up with very good solutions for my problems and went out of his way to get me all the information quickly so I could get an idea if the project was feasible.

Rosa T. London

Update of old fashioned flat

Architect Your Home really enjoys the challenge of designing small projects. When a space is limited finding creative ways to make it work hard for our customers is very rewarding.

This flat was in quite a bad state when the customer bought it. It was very old-fashioned and the rooms were cramped and awkward. The customer wanted to knock down the walls between the old living and dining rooms in order to create a chic open plan living space. She also wanted to increase the size of her bedroom, build a walk-in wardrobe and create a luxuriously sized en-suite bathroom.

A place to inspire

It is wonderful when someone has an eye for design and the confidence to make their home an expression of their personality. Here the architect came for a half day visit to help the customer re-organise the spaces within her flat and to give her the re-assurance that she was indeed getting the maximum potential out of her home.

With the basics in place she was then able to fit out the flat in a striking way that gave her the stylish home she was after.

Specification Sheet

Design

  • Construction Date
    2007
  • Location
    Chelsea

Budget

  • Construction Budget
    £50,000
  • Fit-out Budget
    £20,000

Construction

  • Joinery
    Unknown
  • Contractors
    Unknown

Brief

To modernise a  2 bedroom flat, create a contemporary open plan living space and provide lots of storage.

Project Timeline

  • 1
    Months

    Planning & Preparation

    • Half day Initial visit hand sketch design drawings
    • Advice on best next steps
  • 3
    Months

    Construction

    • Demolition of walls
    • Installation of first fix services such as plumbing, water, electricity
  • 1
    Months

    Fitting-Out

    • Installation of second fix services including electrics and lighting
    • Fitting of kitchen, appliances bathrooms
    • Build walk-in wardrobe
    • Laying of flooring and decorating.